Case study: Barratt London Nine Elms – May 2016

  • Posted by portman-admin
  • On 25th October 2016
  Case study: Barratt London Nine Elms – May 2016 Data cable terminations at multiple locations and provision of multiple broadbands across three floors. Provision & deployment of a VoIP Telephony Solution for the Sales & marketing Suite and the BRAMS/Concierge area. In May 2016, Craig Berrido, the Project Sales Manager of Barratt London tasked […]
Read More
 1

Testimonial from Barratt Homes’ Project Sales Manager Craig Berrido:

  • Posted by portman-admin
  • On 12th October 2016
” Barratt London instructed Portman Tech to undertake the fit out and installation of the telephone system for our new Sales Suite at Nine Elms Point. Isaac and his team have been fantastic from the start and made what is usually a very stressful job so easy. We were so impressed with Portman Tech that […]
Read More